青春草在线视频,日韩精品第一页,桃色视频在线观看,欧美精品网站,波多野结衣久久,91AV视频,99视频在线,这里只有精品在线

News
News
Introduce the design points of the automotive coating production line
Release time:2023-09-24

The process of automobile coating production line can generally be divided into two parts: first, the surface treatment of metal before coating, also known as pre-treatment technology; The second is the construction process of painting. Surface treatment mainly includes removing oil, dust, rust from the surface of the workpiece, as well as removing the old coating layer during repair operations, in order to improve the surface condition of the workpiece. This includes mechanical processing and chemical treatment of the workpiece surface according to various specific situations, such as phosphating, oxidation, and passivation treatment.

The process flow of the automotive coating production line is: pre degreasing → degreasing → hot water washing → cold water washing → acid washing → cold water washing → neutralization → cold water washing → surface adjustment → phosphating → cold water washing → hot water washing → pure water washing → drying


Related articles

Tel:0769-87503698
Contact Us
Dongguan Guanghong Machinery Equipment Co., Ltd
Contact person: Mr. Yang
Mobile: 13926874694
Tel: 0769-87503698
Email:YL.yang@guanghongjixie.com
Address: Building 1, No. 138 Baifeng Road, Zhangmutou Town, Dongguan City
Website:www.otaoa2023.cn

Scan for more information

Copyright ? 2023 Dongguan Guanghong Machinery Equipment Co., Ltd. 粵ICP備19009111號(hào)
屏东县| 霍山县| 玉龙| 渝北区| 长白| 甘孜| 沧源| 务川| 昭平县| 泾阳县| 浦县| 长治县| 平江县| 璧山县| 万宁市| 滨州市| 汾阳市| 扶风县| 华安县| 元江| 凤凰县| 临海市| 行唐县| 桂平市| 崇礼县| 涟源市| 阿勒泰市| 宜川县| 虎林市| 巫山县| 石景山区| 当阳市| 巴楚县| 瓦房店市| 日喀则市| 荃湾区| 萝北县| 新郑市| 吉木乃县| 扬中市| 清丰县|